ENGINEERING DEPARTMENT |
- To build new roads upto 60 feet with ,towidem the roads repairs and recarpeting
of roadsetc
|
- To build Society roads by raising public funds-to prepare new footpath, to repair
them, scrapping etc.
|
- To build new roads upto 80 feet and the repair work is done by the municipal
office of PWD
|
- To build new buildings and to maintain the municipal properties
|
- To build and maintain school buildings
|
- To sanctiion half inch domestic and one inch industrial connection
|
- Repair work of main water work pipe ;lines upto 22 inch
|
- Legal procedure organizer illegal connection, repair of polluted water connection
|
- Issuing permits regarding stand posts free connection hand pump, drainage
|
- Legal procedures againsts illegal drainage connections.
|
- To construct and maintainrain water drain
|
- To maintain and clean temperory/permanent drainage
|
- Disposal of rain water through new additional catch pits
|
- Issuing permits fur layout high rise buildings procedures against illegal
construction
|
- Implemantation of town planning scheme-recovery of betterment charges
|
- To take action against public nuisance and damage property
|
- Issuing permits for mandap, banner, Hoarding collection of land rent, property
rent
|
- To remove permanent,temperory encroachments, alternative arrangements againsts
obstruction of slums.
|